'Vande Bharat Manufacturing On Fast Track', Says Railways Minister Vaishnaw After Visiting Integral Coach Factory In Chennai
Indian Railways Invites Bids For 200 Vande Bharat Trains With AC Sleeper Facility
Medha, Siemens And Bombardier Among Seven Players Given The Nod For Making 58 Vande Bharat Trains
Garib Rath Trains To Be Upgraded With AC Economy Coaches; Passengers To Pay A Slightly Higher Fare
Tejas Rajdhani: Indian Railways Upgrades High-Speed Train Service With 5 Per Cent Increased Fare
Chinese JV Among Three Players Enter Race For Making 44 Vande Bharat Trains; Tender Stipulates Minimum Local Content Of 75 Per Cent
Railway Board Will Now Float Tenders For Rs 1,500 Crore Vande Bharat Train Project
Indian Railways Drafts In Three Production Companies To Speed Up Manufacturing Of Vande Bharat Trains
Indian Railways’s Integral Coach Factory Set To Achieve Target Of Manufacturing 4,000 Coaches In 2019-20
Vande Bharat Express: Second Train With New Modifications To Be Rolled Out In First Week Of May
Watch: Testament To Indian Engineering, Train 18 Glides At 180 Kmph In Trials Between Kota-Sawai Madhopur
Watch: India’s First Engine-Less Train Getting Ready At The Integral Coach Factory In Chennai
India’s First ‘Engine-Less’ Train To Be Rolled Out Next Month, To Replace Delhi-Bhopal Shatabdi
Chennai Hosts Three Day-Long Rail Coach Expo
Railways To Say Goodbye To Shatabdi Express, Replace Them With ‘Make In India’ Train 18